Steel Fabrications Steel Constructions Tilt Panel Erection Plant Relocations Heavy Transport Project Management Project Contracting Crane Hire Rigging Services
CCH Constructions have drop deck semi trailers, flat top trucks and Hiab's for a wide range of transport requirements. For the larger more complex work Piacentini's Transport is our preferred contractor. CCH Constructions have had a good working relationship with Piacentini's for many years. Together our companies have successfully coordinated numerous plant moves and other logistical projects.
Our combined experience in the mining sector includes the following:
Open Cut Shaft Dredging operations Crushing and screening Concentration plants Dry plants Experience in the building sector: Tilt-panel erection Steel fabrication/erection Commercial buildings Large Industrial Sheds
Safety CCH Constructions are dedicated to maintaining a safe working environment at all times. Our safety commitment is demonstrated with policies, procedures and training. All equipment and machinery is part of registers and under goes regular preventative maintenance, safety checks and systems are audited.
Some Completed Projects…
Construction of "Char Separation Facility" at ILUKA SR2 Client--Kerman Contracting Includes: · Steel erection (up to 40m high) · Tie-ins to existing · Removal of existing platforms · Machinery installations/commissioning · Pipe chute fabrication and fitting
Plant Relocations (Numerous) Capel to Gingin Client--Iluka Resources Includes: · Cranage, Transport and labour package · Disassemble/Relocate and reassemble plant · In-pit, Concentration and screening plants · Commissioning and maintenance
Exmouth Marina Development Tilt Panel Erection Client- Barry Hughes Builders Work is continuing on the Marina Development in Exmouth. Some 800--900 tilt panels shall be erected at the finish of this project.
Railway Bridge Change out (5 modules) Client--John Holland Includes: · Removal of existing bridge · Placement of new module sections · Transportation of 21 tonne sections along riverbank
Transport of Mining Modules Mildura Victoria to Turkey Creek NW Western Australia Client- Bemax (Cable Sands) Several Mining Modules have been successfully transported from Mildura in Victoria to Turkey Creek in WA's upper North West. The logistics project was conducted through 4 Australian States and Territories including Victoria, South Australia, Northern Territory and Western Australia. All requirements for the transport of oversize loads through these states was organised in house.